Fuel Safety Section - Fuel Safety Installation Registration/Permit

To complete this application, you will need information about your company, including the detailed information listed below.

Please make sure that you have the following information available before you begin:

  • The civic address of the installation location
    • If a business, you will also require the operating name of the business where the installation will take place
  • The details of the installation, including:
    • BTU load
    • Heating Load (if applicable)
    • Fuel Type
      • If fuel type is propane, container size is required

Important Notes:

  • A registration/permit is not required for a removal
  • You will be able to complete this transaction and print your registration/permit via this online service if your BTU load does not exceed 3,000,000 BTUs
  • You cannot complete this application form via the Internet if any of the following apply as Plans and Specifications are required:
    • A total system load of greater than 3,000,000 BTUs. There will be a delay of 10 business days before your permit will be processed
    • The application is for a:
      • Dispenser 
      • Plant 
      • Digester
      • Landfill gas facility
      • Natural gas vehicle refuelling station
      • Field approved equipment
      • Foundation and supports for a vertical storage tank or horizontal tank, with a capacity of 1700 uswg or greater
To apply for a fuel safety registration/permit using a printed application form, please click the link below: